We discharged the cranes from vessel TERN at Yusen Terminal Inc. in Los Angeles Port, The cranes were discharged from vessel, by our Electrical Drive Bogie unit, onto temporary rails at the quay and pulled onto parmanent rails via temporary slope by big forklift.