We installed 350 tons/80 tons x 40.9m overhead crane on the heels of February, at Engine Factory A, Tamano Works, Mitsui Engineering and Shipbuilding Co., Ltd.The crane was shipped at Oita as components from Oita on 11th June and handed over on 29th June after inspection.