2009.11.08
We loaded a existing gantry crane at North Container Berth, Osaka Nanko. The crane was jacked up by 8 units of 500 tons jack and shifted onto temporary rail. The Electric Drive Bogie carried the crane from berth to TENSHO deck.
Back to What's new▲