HOME What's new Business outline Corporate Profiles Recruiting Info Link
HOME>What's new
What's new

2009.05.15

Transportation and installation of a jib crane

We transported and installed a 150 tons jib crane for Tamano Works, Mitsui Engineering & Shipbuilding Co., Ltd. The crane divided into 2 blocks of upper and lower were loaded onto barge TENZAN at Oita on 10th May, and assembled on crane rail at No. 2 dockyard, Tamano Works

TOP

Back to What's new▲

2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005
Copyright(C)1998 BINAN DEVELOPMENT CO., LTD. Allrights Reserved.